Learn How To Save thousands With Kelsch Construction In Utah's New Homes Communities.
I do not bait and switch clients with a low bid to get the job. I bid to build the job. I factor every foreseeable cost at the start, and this includes contingencies in key areas. I always build in this order, quality, time and cost. All three must be included, and in that order.